A large manufacturing plant needed assistance with their heat exchanger pump and, being an industry leading pump specialist, Dura Pump were asked to assess the situation and come up with the best possible solution.

Challenge

The plant had a failing Grundfos TP heating pump and needed a replacement fast. To receive an exact replacement pump would mean a 3-week wait and if the original pump were to fail completely production would come to halt. Dura Pump were required to provide an efficient solution to prevent the failure affecting productivity on the plant.

Solution

The response was to specify a replacement Grundfos model and small spacer to match the existing pipework. From receiving the initial call to supply was just 3 days.

Results

Dura Pump were able to provide an ideal solution before the original pump failed. With no breakdown, there was no production loss and the client was relieved to avoid the costly repercussions of a pump failure. A definite all-round success!

< Back to Case Studies

Accreditations & Affiliations

About Us

Mission
Our mission is: To create flow the way you need it

Vision
We are driven by our vision, where we see: A world where pump reliability is paramount.

We see ourselves: Satisfying the pump user through effective and efficient fluid management

 

Useful Links

Contact

01604 648 800
mail@durapump.co.uk

Dura Pump Ltd
Boughton Fair Lane
Moulton
Northants
NN3 7RT

Latest News

5 Benefits of using Dura Pump

5 Benefits of using Dura Pump Dura Pump is the only fluid control specialist that guarantees increased productivity and profitability for our clients. We’ve compiled...

Read more >

Identifying pump faults

Identifying pump faults           How often should a pump fail? This is a question we are commonly asked, and is a...

Read more >

© Copyright 2018 by Dura Pump. All rights reserved.