Project update: Milton Keynes Hospital

Posted On Posted on 20th February, 2017 by Dura Pump
Dura Pump Projects

Project update: Milton Keynes Hospital contract

We’re pleased to be able to support NHS Milton Keynes Hospital with the replacement of a number of its heating pumps and the installation of inverters. All electrical and mechanical work is included in the contract with a clear plan to limit the downtime.

The picture to the side is an example of a failed inverter at the site. If you have similar needs, reach out to us at mail@durapump.co.uk or 01604 648800.

 

Share this article
New Pump System Required? CALL Dura Pump TODAY on 01604 648 800 Cta Icon