Rapid Response When Hospital Suffers a Failed Heating Pump
The hospital called us in frustration at 9 a.m one morning, after having waited six weeks for its existing supplier to repair a failed twin head heating pump.
The hospital called us in frustration at 9 a.m one morning, after having waited six weeks for its existing supplier to repair a failed twin head heating pump.
A large private hospital called Dura Pump at 2.30 p.m. on a Friday with a critical emergency of its own. We had the answer.
After 20 years of service, an old booster set at a high-security prison was failing. We were set two challenges and completed both.
With energy costs constantly rising, Warwick Hospital approached leading industry specialists Dura Pump on how to save energy.
Nottingham Community Housing Association (NCHA) is one of the largest, local housing groups in the East-Midlands. No job is too big for Dura Pump.
When this residential establishment encountered a burning issue within their chilled water cooling system, it was time to call out a specialist – and fast!
A community school, which caters for children with a range of needs, was suffering from problems with the pumps supplying their hydrotherapy pool.
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
A large NHS Hospital in South London was experiencing damage and expensive repairs as a result of floods.
A well-known category B prison suffered a loss of heat to the main wing when its system failed.
A failed inverter was a risk to a hospital sanitisation and Dura Pump were there to offer a solution.
A category C male prison in Greater London with an ageing set of pumps needed our support before the system failed.
An NHS hospital needed a way to monitor the levels of their potable and softened water tanks remotely.
An NHS hospital had developed an issue with a pump in one of their pump stations.
A large school had installed a pump station to remove foul/wastewater. After many blockages and failures, Dura Pump had to find a solution.
An NHS hospital tasked Dura Pump with the challenge of replacing an old, obsolete belt-driven heating circulator pump.
Dura Pump supplied a reliable Pressurisation Set Solution to support a busy London Hospital.
Responding to a flood situation at a Category C Men’s Prison, Dura Pump installed new muncher systems.
Challenged with preventing algae buildup, Dura Pump specified a new pump system for a local Council’s pond area.
The proper and efficient use of a chilled water system is crucial - especially where natural water reserves are used to precool the chiller units.
When a secondary school called us with a failed Armstrong pump, we knew we had to act fast as this meant they were running on just one main heating pump.
A sixth form college emailed us with a serious issue: a failed LTHW heating pump.
Dura Pump were approached by a leading electronic chip manufacturing company who were in need of an upgraded wastewater system within their laboratory.
The Dura Pump team replaced an obsolete pump system at the University of Cambridge to offer better efficiency and energy savings.
Dura Pump was contacted by a client in the education sector who were experiencing a series of issues with their pump system. Having experienced booster failures on a couple of the pumps,
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.