Injection Moulding Company Saves £250,000 Over 5 Years
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
A world-renowned flooring manufacturer approached us with an urgent need. Its insurance company had condemned its old fill and spill system.
Glazpart is a leading player designing and manufacturing Plastic Glazing Accessories for the Fenestration Industry.
A company that manufactures titanium fins for jet engines required our expertise with some of its pumps, due to failures.
We were recently approached by a powder coating company whose production line had suffered a fault. Dura Pump happily accepted...
A large aroma manufacturing plant required assistance after receiving the results of an inspection from the Water Authority.
A large manufacturing plant needed assistance with their heat exchanger pump and, being an industry-leading pump specialist, Dura Pump had...
Dura Pump were contacted by a floor manufacturing plant in Coventry who required a basic pump station for stormwater runoff from their yard.
When a large global heat treatment company needed our help to update their tired 20-year-old pump system, we were up to the challenge.
A large distribution warehouse needed critical support during COVID-19 lockdown to ensure supplies kept flowing.
Our customers want solutions they can trust in timeframes that suit them. When a customer contacted us with a specific need, we provided the best solution...
A factory that produced plastic road barriers wanted a solution that would improve the sustainability and productivity of their production line.
Dura Pump Supplied A Dewatering Pump To Save A Flood Occurring At A Logistics Centre.
How Dura Pump Successfully Installed Chiller Pumps to Boost a Plastic Moulding Companies Efficiency.
In response to an RO system issue, Dura Pump installed a Cat 5 break tank and pump system to restore water pressure.
Portability was a key requirement for our food industry client. Dura Pump specified and installed an efficient, portable pump station.
A new client called us faced with a problem nobody wants: a failing sewage system. We attended the site and found some very old Mono progressive cavity pumps, SB munchers and level controls that were no longer fit for purpose. The system was tripping out and required a major overhaul.
Dura Pump were approached by a leading electronic chip manufacturing company who were in need of an upgraded wastewater system within their laboratory.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.