Rapid Response When Hospital Suffers a Failed Heating Pump
The hospital called us in frustration at 9 a.m one morning, after having waited six weeks for its existing supplier to repair a failed twin head heating pump.
The hospital called us in frustration at 9 a.m one morning, after having waited six weeks for its existing supplier to repair a failed twin head heating pump.
A large private hospital called Dura Pump at 2.30 p.m. on a Friday with a critical emergency of its own. We had the answer.
With energy costs constantly rising, Warwick Hospital approached leading industry specialists Dura Pump on how to save energy.
Oracle is a world-leading software company, boasting 420,000 customers in more than 145 countries around the globe.
A well-known category B prison suffered a loss of heat to the main wing when its system failed.
An NHS hospital tasked Dura Pump with the challenge of replacing an old, obsolete belt-driven heating circulator pump.
As part of an essential upgrade programme, Dura Pump installed energy efficient, cost-saving direct drive pumps.
When a secondary school called us with a failed Armstrong pump, we knew we had to act fast as this meant they were running on just one main heating pump.
The Dura Pump team replaced an obsolete pump system at the University of Cambridge to offer better efficiency and energy savings.