Injection Moulding Company Saves £250,000 Over 5 Years
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
A world-renowned flooring manufacturer approached us with an urgent need. Its insurance company had condemned its old fill and spill system.
The hospital called us in frustration at 9 a.m one morning, after having waited six weeks for its existing supplier to repair a failed twin head heating pump.
The booster set that supplied water to an entire Shopping Centre failed one Friday afternoon. The set, which had 11kW pumps, was old and...
A large private hospital called Dura Pump at 2.30 p.m. on a Friday with a critical emergency of its own. We had the answer.
A busy retail site had, in a series of emergencies, spent over £140,000 on pump station maintenance and call-outs in the 18 months. Dura Pump were...
After 20 years of service, an old booster set at a high-security prison was failing. We were set two challenges and completed both.
We received a call from Shaw Healthcare one afternoon, saying they had a major problem with the water booster at one of their nursing homes.
In 2015, the engineers at Dura Pump were called in to supply and install vital, large-scale pumping equipment at the Bicester Eco Town development.
We were recently called in by CBRE, the commercial property advisors, to carry out an investigation into the failure of several cold-water booster sets.
Glazpart is a leading player designing and manufacturing Plastic Glazing Accessories for the Fenestration Industry.
With energy costs constantly rising, Warwick Hospital approached leading industry specialists Dura Pump on how to save energy.
A company that manufactures titanium fins for jet engines required our expertise with some of its pumps, due to failures.
Nottingham Community Housing Association (NCHA) is one of the largest, local housing groups in the East-Midlands. No job is too big for Dura Pump.
When making beer, everything has to be ‘just so’. The hops; the recipe; even each pump part: it’s a finely balanced process. That's why Dura Pump...
A large, family-owned pet food manufacturer in Northamptonshire, that makes natural, wholesome pet food with British ingredients needed...
Cummins is a global leader in the design, manufacture and servicing of diesel and alternative-fuel engines, generators and related technology.
Oracle is a world-leading software company, boasting 420,000 customers in more than 145 countries around the globe.
A large, well-known banking tower block, with significant assets and pumping equipment, was being charged £0.12/kW.
We were recently approached by a powder coating company whose production line had suffered a fault. Dura Pump happily accepted...
In Watford’s case, a lack of water pressure was causing problems and something had to be done. So, the facilities team called Dura Pump to help.
A pet food manufacturing plant approached Dura Pump for advice and guidance regarding the specification of a pump to pump gravy.
A large aroma manufacturing plant required assistance after receiving the results of an inspection from the Water Authority.
Dura Pump were excited to work on a new, modern state-of-the-art dessert production factory, who required assistance with upgrading their submersible pump station.
A packaged pump station solution was required for two houses in a small residential development, and Dura Pump were happy to apply their expertise.
A busy food production company were fed up of being plagued with persistent submersible pump failures. The team at Dura Pump were...
Dura Pump were called to attend a block of flats in a converted shoe factory. They needed someone to step in and find a resolution. That's exactly...
A large manufacturing plant needed assistance with their heat exchanger pump and, being an industry-leading pump specialist, Dura Pump had...
Dura Pump were contacted by a floor manufacturing plant in Coventry who required a basic pump station for stormwater runoff from their yard.
A facilities company required our team to carry out a service on their pump stations and to replace the cutter blades on the pumps.
When this residential establishment encountered a burning issue within their chilled water cooling system, it was time to call out a specialist – and fast!
When a large global heat treatment company needed our help to update their tired 20-year-old pump system, we were up to the challenge.
A community school, which caters for children with a range of needs, was suffering from problems with the pumps supplying their hydrotherapy pool.
Dura Pump were approached by a renowned development company to provide five pump stations for a large mixed-use high rise tower...
A very large site comprising of 26 pump stations, in varying sizes from large twin pump stations sets, to medium size single pump stations.
A Global Engineering Consultancy has had new pump system installed with a downtime of less than 2 hours!
A large distribution warehouse needed critical support during COVID-19 lockdown to ensure supplies kept flowing.
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
Creating simple cost-effective systems can reduce the need for labour-intensive work, safer handling of product and manual handling.
A large food manufacturing site was at risk of contaminating watercourses with their vehicle bay run-off.
A food manufacturing plant required a pump to transfer various food products but was at risk of running dry.
A large NHS Hospital in South London was experiencing damage and expensive repairs as a result of floods.
Snack food factory required a solution to fix wastewater blockage issue that was impacting the process.
A well-known category B prison suffered a loss of heat to the main wing when its system failed.
A failed inverter was a risk to a hospital sanitisation and Dura Pump were there to offer a solution.
A large cooling tower system at a pet food manufacturer was operating 24 hours a day/6 days a week and was wasting a lot of energy.
A remote monitoring system helped a housing estate prevent problems before they could develop further!
Our customers want solutions they can trust in timeframes that suit them. When a customer contacted us with a specific need, we provided the best solution...
A category C male prison in Greater London with an ageing set of pumps needed our support before the system failed.
An NHS hospital needed a way to monitor the levels of their potable and softened water tanks remotely.
An NHS hospital had developed an issue with a pump in one of their pump stations.
The Dura Pump engineers were challenged with replacing an obsolete control system at a busy food manufacturing company.
A large school had installed a pump station to remove foul/wastewater. After many blockages and failures, Dura Pump had to find a solution.
A factory that produced plastic road barriers wanted a solution that would improve the sustainability and productivity of their production line.
An NHS hospital tasked Dura Pump with the challenge of replacing an old, obsolete belt-driven heating circulator pump.
Dura Pump were contacted for their expertise when the largest British-Owned crisp manufacturer suffered a pump outage at their production plant.
The Dura Pump team replaced an obsolete pump system at the University of Cambridge to offer better efficiency and energy savings.
Dura Pump supplied a reliable Pressurisation Set Solution to support a busy London Hospital.
Dura Pump Supplied A Dewatering Pump To Save A Flood Occurring At A Logistics Centre.
How Dura Pump Successfully Installed Chiller Pumps to Boost a Plastic Moulding Companies Efficiency.
Responding to a flood situation at a Category C Men’s Prison, Dura Pump installed new muncher systems.
Challenged with preventing algae buildup, Dura Pump specified a new pump system for a local Council’s pond area.
The proper and efficient use of a chilled water system is crucial - especially where natural water reserves are used to precool the chiller units.
As part of an essential upgrade programme, Dura Pump installed energy efficient, cost-saving direct drive pumps.
Following a waste tank collapse, Dura Pump installed a bespoke concrete ring pump station with a GMS monitoring system.
In response to an RO system issue, Dura Pump installed a Cat 5 break tank and pump system to restore water pressure.
Portability was a key requirement for our food industry client. Dura Pump specified and installed an efficient, portable pump station.
A new client called us faced with a problem nobody wants: a failing sewage system. We attended the site and found some very old Mono progressive cavity pumps, SB munchers and level controls that were no longer fit for purpose. The system was tripping out and required a major overhaul.
A failed fountain pond pump system was identified during building work at an English stately home. Our team was called upon to examine the drainage pumps and provide reliable, efficient solutions for our client.
Troubled with a faid Klargester unit, a new client reached out to the Dura Pump team for a reliable solution. As the Klargester unit was used for treating waste sewage, it was essential to resolve the issue.
When a secondary school called us with a failed Armstrong pump, we knew we had to act fast as this meant they were running on just one main heating pump.
A sixth form college emailed us with a serious issue: a failed LTHW heating pump.
An abattoir was experiencing high levels of solid content in their DAF wastewater treatment plant, causing severe blockages in their drainage system.
Dura Pump was contacted by a client in the education sector who were experiencing a series of issues with their pump system. Having experienced booster failures on a couple of the pumps,
Dura Pump was approached by a client who was working in property management across a new housing development based in the UK, which included an installed pump station.
We had one of our clients - a chicken processing plant - contact us with an issue regarding a failing chilled water pump.
Dura Pump were approached by a leading electronic chip manufacturing company who were in need of an upgraded wastewater system within their laboratory.
Dura Pump were approached by a leading electronic chip manufacturing company who were in need of an upgraded wastewater system within their laboratory.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.