20 hospital operations saved from cancellation
A large private hospital called Dura Pump at 2.30 p.m. on a Friday with a critical emergency of its own. We had the answer.
A large private hospital called Dura Pump at 2.30 p.m. on a Friday with a critical emergency of its own. We had the answer.
After 20 years of service, an old booster set at a high-security prison was failing. We were set two challenges and completed both.
Oracle is a world-leading software company, boasting 420,000 customers in more than 145 countries around the globe.
A large, well-known banking tower block, with significant assets and pumping equipment, was being charged £0.12/kW.
A failed inverter was a risk to a hospital sanitisation and Dura Pump were there to offer a solution.
A large cooling tower system at a pet food manufacturer was operating 24 hours a day/6 days a week and was wasting a lot of energy.
The proper and efficient use of a chilled water system is crucial - especially where natural water reserves are used to precool the chiller units.