One of our facilities management clients reached out to us concerning their leisure centre, where the existing DAB twin booster set was on the brink of failure. They needed a swift solution.
Our team promptly specified and provided a quote for a replacement, a twin Lowara booster set with variable speed, which could be delivered within just 10 days. Our operations team conducted a site survey, ensuring all necessary details were ironed out before our engineering team arrived on-site to carry out the installation.
Two of our skilled on-site engineers expertly removed the old booster set, seamlessly installed the new unit, and meticulously handled all electrical and mechanical connections, including necessary pipework modifications. Importantly, they ensured the new unit was up and running before the old one could fail completely. The entire process, from the moment the order was placed to the successful installation, took only 8 days, meeting the leisure centre’s need for a rapid turnaround.
Thanks to this swift and effective intervention, the leisure centre experienced no equipment failures, thereby guaranteeing customer satisfaction and enabling them to operate at full capacity.