Premier League Club Opts for Lowara Booster Set Installation
The Challenge
Our customer, a Premier League Football Club in the West Midlands, had an end-of-life booster set operating their water supply. The pressure was continuously dropping and needed modernisation. The position of the old pump was hard to get to and limited maintenance.
The Solution
Our recommendation was a new fully automatic Lowara SMB variable–speed twin booster set installation configured to make the pump accessible.
Technical Details:
- 2 Variable speed SMB 0.75Kw 230V Lowara pumps with inverter pump controls.
- Pressure transmitter/vessels
- Control panel
- Frame mount for easy installation and maintenance.
Our engineering team installed, programmed and tested the system.
The Outcome
Our customer has reached their goal with a modernised system designed for maximum energy efficiency and can communicate with a Building Management system (BMS). Our inverters are designed to maintain the correct pressure regardless of fluid flow and fluctuation.
Gallery
Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs