Skip to Main Content

Resolving a Persistent Issue with a Gravy Pump

icon image

The Challenge

In the dynamic world of food manufacturing, even the smallest procedural changes can lead to unforeseen challenges. One of our valued clients in the industry encountered such a hurdle when modifications in their process caused temperature fluctuations, thickening their gravy and, consequently, causing failures in their hygienic centrifugal pumps.

puzzle icon

The Solution


Our dedicated technical team faced the task of not only identifying a pump that could seamlessly integrate into the existing setup but also doing so within a short timeframe to minimize downtime. After careful consideration, the team proposed the implementation of an Alfa Laval hygienic lobe pump.

outcome icon

The Outcome

This pump proved to be a game-changer, addressing the viscosity challenges posed by the cooled gravy and accommodating the higher temperatures during peak production. Its compact design allowed it to fit snugly into the available space with minimal pipework modifications, ensuring a smooth transition. The key advantage was its availability, with the pump ready for installation within just one week, significantly reducing downtime.

The successful integration of the Alfa Laval pump resulted in a remarkable improvement in our client’s production efficiency. Pump failures on the gravy line became a thing of the past, alleviating stress for the engineering manager and saving valuable engineering time. This case exemplifies how a strategic pump solution can not only resolve operational challenges but also contribute to enhanced productivity and reduced downtime in the food manufacturing sector.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager