The Challenge

A chicken processing plant contacted our company with a technical concern regarding a Varisco J4 self-priming pump. They reported insufficient flow, and they were uncertain whether the problem originated from the system or the pump itself.

puzzle icon

The Solution


Upon reviewing the situation, our technical team concluded that the pump was likely the source of the problem, given that it was a new issue rather than an ongoing one. To precisely identify the issue, we retrieved the pump from the client’s facility and conducted a flow rate test in our workshop. The test revealed that the maximum flow capacity was only 885 litres per minute, significantly below the expected 2,500 litres per minute. Further inspection uncovered excessive wear on both the impeller and wear plate, resulting in a 3mm gap between them, whereas the manufacturer’s recommendation indicated a 0.5mm tolerance.

To rectify the situation, we meticulously rebuilt the pump, replacing key components such as shafts, sleeve, wear plate, impeller, motor bearings, and gaskets. Subsequently, we returned the pump to the client’s site.

outcome icon

The Outcome

As a consequence of our intervention, the client can now rely on a fully repaired pump, confident that the issue has been effectively resolved. This restoration ensures that the wastewater will once again discharge at the correct rate, meeting operational requirements.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager