A Modern Makeover Undermined by Ageing Infrastructure

icon image

The Challenge

On behalf of the landlords, we were called to inspect a wastewater pump station servicing a 10,000 sq ft city office block in London. The building was undergoing a major refurbishment and while the visible surfaces were being transformed into a sleek, modern workspace, the building’s wastewater pump station, a vital piece of infrastructure was on its last legs.

After 20 years of service with no regular maintenance, the following problems had developed:

  • One of the two pumps had completely failed, placing the entire load on a single, ageing unit.
  • The pump start relay was broken, preventing automatic operation.
  • The high-level alarm system was non-functional, meaning there was no warning system of failure.

The station had already flooded on several occasions causing messy and hazardous issues.

puzzle icon

The Solution


Dura Pump recommended a full system overhaul as a simple repair was not an option. Firstly, the pit had to be completely drained and cleaned and the existing pump station decommissioned. Our engineers systematically removed every component of the old station: the failed pumps, corroded pipework, seized valves, unreliable float switches and the outdated control panel.

Our engineers then installed a brand-new pump station designed for reliability and modern building management.

Technical Specification of the New System:

Our solution was built around robust, high-performance components:

  • Pumps: Two Lowara DOMO GRI 1.5kW 415V submersible grinder pumps were installed. These powerful units are designed to handle the demanding wastewater needs of a commercial office block with ease.
  • Infrastructure: The system was rebuilt with heavy-duty PVC pipework, non-return valves, and galvanised guide rails, ensuring durability and simplifying future maintenance.
  • BMS (Building Management System) connections for seamless integration into the building’s central control system.

Our certified engineers handled all mechanical and electrical connections before rigorously testing and commissioning the entire station, ensuring it was performing perfectly.

outcome icon

The Outcome

A Smart, compliant, and future-proof system. With the project complete, the building is now supported by a reliable wastewater system worthy of its prestigious London address. The risk of flooding has been eliminated, replaced by peace of mind.

This smart refurbished office block now has an upgraded and modernised wastewater system that is not only safe and compliant but is a genuine asset, ready to serve the building and its new tenants for decades to come.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager