Obsolete Pump Replaced, Heating Secured: Dura Pump Delivers for NHS Hospital Despite Access Challenges
The Challenge
Failure of an obsolete, irreparable LTHW heating pump with no existing backup. Extremely difficult plant room access via stairs and a crow’s nest ladder added significant complexity.
The Solution
Dura Pump navigated the challenging access to replace the failed unit with a modern Wilo Yonos GIGA 80 twin-head, inverter-driven pump.
Key actions included:
- Installing a twin-head unit to provide essential standby capability.
- Re-establishing the connection to the hospital’s Building Management System (BMS).
The Outcome
- Heating System Secured: Built-in backup system avoids the previous risk of failure.
- Operational Continuity Protected: Ensures consistent heating, crucial for patient welfare.
- Modern, Efficient System: Upgraded technology improves reliability and integrates with BMS.
- Problem Solved: Complex access and obsolete pump equipment challenges successfully overcome.
Ensure your critical systems won’t let you down. Contact Dura Pump to learn how we can improve your pump system reliability and performance.
Before
After
Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs