The Challenge

HR Wallingford designs smart, resilient solutions to help people to live and work sustainably with water. Experts in how water moves, behaves and influences communities, they use large water tanks to study coastal protection, flood management and other hydrological systems, which require the use of large pumps to create flow.

One of HR Wallingford’s most important pieces of equipment of this type is a large 55kW Wier axial-flow pump, which had begun to experience performance shortfalls and display signs of wear. A major difficulty was that as this specific model was no longer in production, the organisation was unable to obtain the necessary spare parts needed to keep it running.

puzzle icon

The Solution


Dura Pump has extensive experience with pumps large and small, as well as the expertise to offer an end-to-end solution for this exact situation.

Our team of engineers visited the site to remove the pump and bring it back to our facility to deliver a quote and effect the repairs. Even though this model was no longer supported, Dura Pump was able to source spares, and fabricate those which were no longer available. Our full overhaul, which comes with a 12-month warranty, included replacement of motor bearing gaskets, gland packing, and a full strip-down of the pump with a clean and complete re-spray.

 

“We work with a lot of customers who need a full-service vendor who can handle the entire process of dismantling, reconditioning and re-installing a pump system, and there aren’t many companies that can do that as well as sourcing replacement parts for hardware that might have been out of production for decades,” explains John Calder, Technical Director. “Our engineers can overhaul just about any kind of pump system, even going so far as to fabricate new parts from scratch, to get it working as good as new!” 

 

After this, our engineers were able to deliver the pump back on-site and reinstall the pump, re-certifying it for use.

outcome icon

The Outcome

Dura Pump’s expertise gave HR Wallingford a complete solution all from a single point of contact, and ensurea vital piece of equipment was able to continue service without the additional time and expense of sourcing and purchasing a brand-new replacement. It meant that for a fraction of the cost of a new pump, the organisation could sustainably continue their work.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager