Major London Railway and Underground Station Chooses Dura Pump for Booster Set Upgrade.

icon image

The Challenge

For a major national railway station, having high-quality, reliable infrastructure is crucial. This extends to all systems, including pump operations. Dura Pump was commissioned to install a new booster set to enhance the resilience and reliability of the station’s pump system and to improve energy efficiency.

puzzle icon

The Solution


Dura Pump supplied and installed four Hydrovar pump-mounted inverters. The Lowara Hydrovar is an intelligent control system that adjusts pump performance to match demand.

Additionally, we replaced the larger Flamco 300L vessel with an upgraded, smaller Flamco Airfix 200L vessel. This change reduces the legal requirement for annual checks, streamlining maintenance.

Key Points

  • 35% Reduction in Electricity Usage: The system now operates 24/7 at 27p per kWh.
  • Minimal Disruption: Project completed out of hours to avoid disrupting station operations.
  • Advanced Technology: Utilised the latest technology to deliver energy efficiency.
outcome icon

The Outcome

By improving the pump system’s resilience and reliability, we achieved a 35% reduction in electricity usage for our customer. This enhancement not only eliminates wasted energy but also boosts the system’s productivity.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager