The Challenge

Following a detailed site visit several critical issues were identified across the museum’s heating, chilled water and condenser pump systems.

The systems assessed spanned across three plantrooms and they were operating with a number of ageing pump systems, some of which included components that were end of life and no longer supported by the original manufacturer. This created a growing risk around reliability, spares availability, unplanned downtime and long-term maintenance.

A further issue was that, although some systems already had inverters installed, they were running at a fixed speed rather than responding to actual system demand. This meant the museum was not benefitting from the full energy-saving potential of variable speed control.

With pumps running at fixed frequency, 24 hours a day, 365 days a year, the systems were consuming more electricity than necessary and increasing the site’s operational costs and carbon footprint.

The Solution

Dura Pump recommended a phased upgrade approach tailored to each plant room and pump system.

The solution included replacing pumps, inverters and sensors where required. On selected systems, Dura Pump proposed retaining the existing inverters and reprogramming them to work with new pressure sensors, allowing the pumps to operate based on demand rather than at a fixed speed.

By the end of the works, all upgraded systems would be controlled locally by inverters and sensors, while still providing the required information back to the site’s BMS.

outcome icon

The Outcome

By implementing the recommended upgrades, the museum would benefit from improved system reliability, increased energy efficiency and a more future-proof pump installation.

Key benefits include:

  • Improved reliability and uptime across critical plant
  • Reduced risk from end-of-life equipment
  • Increased efficiency and lower electricity usage
  • Reduced downtime and maintenance risk
  • Improved performance across heating, chilled water and condenser systems
  • Reduced carbon footprint
  • Reduced plant room noise
  • 24-month warranty on pumps and installation
  • Spares availability for at least the next 10 years
  • Continued BMS visibility for site teams

Combined ROI and Energy Savings

Across both proposed upgrade packages, the museum could achieve combined annual savings of:

96,973.20 kWh per year

This equates to an estimated annual cost saving of:

£24,243.30 per year

Based on the combined annual saving, the overall estimated payback period is approximately:

2.62 years.

Summary

The museum was operating with ageing pump systems, end-of-life components and fixed-speed operation that was limiting efficiency and increasing running costs.

Dura Pump’s proposed solution replaces and upgrades key pump systems, introduces demand-led control through inverters and sensors, and improves long-term reliability while maintaining BMS visibility for the site team.

With estimated combined savings of 96,973.20 kWh per year, annual electricity savings of £24,243.30, and an overall estimated payback of approximately 2.62 years, the project offers a strong return on investment while supporting the museum’s wider energy reduction and carbon saving objectives.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager