Skip to Main Content

Upgraded Pressurisation Set for a Leading UK University

icon image

The Challenge

In a recent success story for Dura Pump, we were awarded a service maintenance contract for pump systems running through a large university campus based in the UK.

During one of our first maintenance visits, our team of engineers carried out a procedural assessment of the pump systems in use. We quickly discovered that one old Grundfos pressurisation set was seized up and not working.

Given the age of the Grundfos pressurisation set, all of the parts within it were obsolete. This meant that the most cost-effective method of dealing with this problem was to replace the unit entirely.

puzzle icon

The Solution


Dura Pump’s team of experienced pump specialists got to work in specifying an alternative modern unit with twin pumps, digital read out and BMS connections: the Flamco Flexfiller 225D Pressurisation Set.

Once the new unit was specified, our engineers attended the site of the university to remove the old seized up unit. Installing the new Flamco Flexfiller 225D pressurisation set required careful electrical and mechanical connections, along with essential pipework modifications. Additionally, Dura Pump supplied and installed a new isolation valve on the discharge side. This ensures easier and more efficient maintenance.

After completing the installation, our team thoroughly checked the settings to confirm accuracy. We then tested the pressure vessel, guaranteeing the system operated at peak performance.

Key actions included:

  • Installing a twin-head unit to provide essential standby capability.
  • Re-establishing the connection to the hospital’s Building Management System (BMS).
outcome icon

The Outcome

Following our recommendations and the completion of this project, the university did not lose any downtime or pressure in the system. The new unit automatically runs the pumps periodically; preventing them from seizing up and stopping the initial issue from repeating itself.

Our customer now has only one provider to deal with which makes for a simpler and more reliable service: Dura Pump.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager