Skip to Main Content

Would you like to see a 60% saving on your electricity?

icon image

The Challenge

Are you operating an old pump plant room?

An innovator in communication networks was looking to upgrade their ageing pumps and controls. With six pumps powering their heating and cooling process, the absence of inverter-driven mechanisms meant that these pumps ran continuously at full capacity, resulting in expensive energy consumption.

puzzle icon

The Solution


Dura Pump was entrusted to deliver a comprehensive solution from design to installation. We recommended six new Grundfos energy-efficient, variable speed-controlled centrifugal pumps accompanied by upgraded pipework, bellows and a VSD inverter-driven control panel. Our expert team executed the mechanical and electrical installations, including cables, isolators, and bellows, completing the project within two weeks with the assistance of three engineers.

We anticipated substantial energy savings with this solution, estimating a payback period of circa two years. The excellent news for our customer was that the savings meant the project will now payback in less than a year and they are seeing circa a 60% saving on electricity usage.

outcome icon

The Outcome

The customer now has a completely new and reliable energy-efficient plant room which is delivering them significant cost savings and operational efficiency.

Key Points

  • Huge Energy Savings: Circa 60% reduction in electricity usage, surpassing initial estimates.
  • Reduced Carbon Footprint: Contributing to environmental sustainability through reduced energy consumption.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager