The Challenge

A company that manufactures titanium fins for jet engines required our expertise with some of its pumps, due to failures. Their highly complex manufacturing process is entirely dependent on having the correct amount of chilled water at specific points. Should the water not be available when required, wastage can quickly occur and the associated downtime costs are huge.

The pumps that supplied this chilled water were failing and needed replacement before there was a catastrophic failure. The system had a history of failing pumps, typically because of failed mechanical seals or bearings. The key issue for this case was downtime; the pumps provide the cooling for the whole system which means the entire factory is inoperable when these pumps are not running.

puzzle icon

The Solution


We ran an analysis on the system and found that the pumps currently installed were running “off curve”. This resulted in cavitation, which resulted in failed bearings and seals. We found the system required a relatively low heat with a high flow rate to lift the cooling water to the top of the cooling tower. The site had five Worthington Simpson pumps with 5.5 kW two-pole motors; three of these pumps were running at any one time. The pipework was at an acceptable standard but the bellows and valves required replacement.

We proposed to replace the five pumps with three KSB Etablocs which had 5.5 kW six-pole motors. We replaced the bellows, isolation valves and non-return valves at the same time. Our CAD team went to the site and drew the existing system so that we were then able to design the new pumps into the system, highlighting any potential issues. This resulted in us replacing a section of pipework to reduce the downtime and improve the flow dynamics.

outcome icon

The Outcome

We designed and manufactured the proposed system in our workshop so we were then able to test that the system was fully functional and ready for operation. We shipped the system to site and then mounted it on a skid to increase the speed of installation and allow for the ease of transportation.

We were advised that a Saturday was available when the system could be turned off for a short while, which would allow us to carry out the installation. Three engineers attended the site and stripped out the old system. The new system was positioned and all parts were mechanically connected and the motors were then wired up and tested. Four hours later, the system was up and running, and fully operational.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager