Bicester Eco Town: foul pump station

icon image

The Challenge

In 2015, the engineers at Dura Pump were called in to supply and install vital, large-scale pumping equipment at the Bicester Eco Town development.

A foul pump system for the new Eco-Town had been designed to include a concrete chamber approximately 14 meters deep and eight meters in diameter, incorporating pumps, dosing systems, an MCC panel and level control. The purpose of the system was to remove waste from hundreds of houses and into the main Thames Water sewers system and also have a 30-day storage capacity, should Thames Water have an issue with the quantity of waste.

Our challenge was to supply the correct parts and carry out the installation in a safe and timely manner. As the system had to be adopted by Thames Water, all works had to be to Sewers for Adoption 7th Edition standards.

puzzle icon

The Solution


We worked with property construction and development experts, Wilmott Dixon, and the water supplier, Thames Water, in order to carry out the specified work for A2Dominion at the Bicester Eco-Development.

We supplied and installed the complete sewage pump system, specifying Grundfos SLV Pumps with 11kW motors. These pumps are powered by Danfoss variable speed drives and the system level is controlled through a Siemens Hydroranger allowing the sewage inflow to be dosed accordingly to manage the septicity levels.

outcome icon

The Outcome

All work was carried out safely and to the standards of Sewers for Adoption 7th Edition, and the sewage pumping system is now fully operational on site.

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager