Why this matters

The NHS estates maintenance backlog in England has climbed to £13.8bn, with a sizeable chunk classed as high or significant risk. These are the kinds of issues that can compromise safe water supply and clinical operations if pumps or controls fail.

NHS guidance requires water systems that:

  • Maintain cold at ≤20 °C to prevent Legionella.
  • Provide domestic hot water (DHW) of 55–60 °C at taps within 2 minutes.
  • Provide resilient distribution across complex facilities.
  • All of which depend on correctly selected, maintained and monitored pumps.
Hospital Clean-Water Pumps

Pump legacy: what is still in many hospital plant rooms

In older trusts, you will often find a mix of:

  • Fixed-speed cold-water booster sets
    Duty/standby (or duty/assist/standby) sets delivering constant speed against widely varying demand. Booster sets are often paired with break tanks; AB air-gap tanks are common where Category 5 protection is needed. Controls may be relay-based with limited telemetry.
  • Vertical or end-suction recirculation pumps for DHW secondary returns
    Sized for historic loads, these pumps run continuously to hold 55–60 °C in loops but can be oversized. This wastes energy and can mask problems. Temperature compliance is still mandatory, regardless of age.
  • Minimal BMS integration
    Older sets may expose only run/fault signals with no real performance data, making proactive maintenance difficult and leading to reactive servicing and callouts.

Pain points these legacy systems create:

  • Energy waste & hydraulic stress from constant-speed operation, short-cycling and water hammer.
  • Compliance risk if temperature or pressure is not consistently maintained at outlets.
  • Low resilience where true duty-standby logic is not verified and automatic alternation is absent.
  • Low data insight into seal wear, bearing temperature, vibration or cavitation events. This means faults surface late and feed the backlog.

Modern pumps: pumps and controls you need in your hospital plant rooms.

1.Variable-speed multistage booster sets

Contemporary booster solutions use vertical multistage stainless-steel pumps with integrated VSDs and intelligent controllers to hold pressure while matching demand. This results in lower energy use, gentler hydraulics, quieter operation and better uptime.

  • AB air-gap, WRAS-approved components remain critical for patient safety and compliance where required.
  • Upgrades in UK healthcare estates routinely report double digit energy savings when replacing fixed speed units Read our case studies.

Hospital Saves 40% on Energy Costs NHS Hospital Upgrades Heating Pumps

2. Intelligent DHW recirculation

High-efficiency in-line circulators with built-in sensors and adaptive controls can modulate to maintain return temperatures. This helps achieve the 55–60 °C requirement at taps within two minutes and surface loop-balancing issues sooner.

3. Built-in connectivity and analytics

Leading platforms like Dura Pump’s remote monitoring and Connect App provide remote dashboards, alarms, performance benchmarking and early-warning diagnostics. This helps with faster root-cause analysis, fewer site visits and proof of compliance trends.

Dura Pump GSM Alert System Dura Pump Connect

 

Modern pumps: how smarter pumps can help tackle the healthcare backlog

  • Fewer failures, fewer callouts
    Soft starts/stops and demand-matching reduces mechanical stress and water hammer, this extends seal and bearing life. Variable-speed sets also reduce dead-heading risk. This Xylem variable speed booster sets document is a great reference guide for VSD booster controls widely adopted in healthcare.
Xylem variable speed booster sets document
  • Energy savings that fund themselves
    Energy is often the largest life-cycle cost. There are many documented healthcare retrofits that show impressive electricity reductions after moving to intelligent pumping, savings that could be reinvested into other backlog items. Two case studies showing how we saved hospitals 40% can be read below.

Hospital Saves 40% on Energy Costs NHS Hospital Upgrades Heating Pumps

  • Better compliance evidence
    Continuous data supports HTM 04-01 operational management and Water Safety Plans (WSGs/WSPs) and underpins CQC scrutiny of estates risk controls.

Five practical upgrades that you could consider for your hospital.

1. Consider replacing fixed-speed sets with WRAS-approved, variable-speed multistage booster sets where you can set duty/assist/standby with automatic alternation and BMS integration (Modbus/BACnet).

2. You could consider using AB air-gap break-tanks for Category 5 protection where applicable.

3. Swap ageing constant speed circulators with high-efficiency, temperature-controlled models.

4. Verify that outlets reach 55–60 °C within 2 minutes and that returns are designed to hold temperature without energy waste or compliance risk.

5. Enable remote monitoring to capture pressure, flow/derived flow, motor power, vibration/temperature and alarm states. Use this data for proactive maintenance.

In summary, swapping legacy, fixed-speed hospital water pumps for variable-speed, connected systems addresses several drivers of the NHS maintenance backlog at once: fewer failures, less energy, better compliance evidence and faster recovery when things do go wrong. Given the current £13.8bn estates challenge, pump upgrades are one of the rare engineering interventions that can lower risk and pay back quickly. If you are a hospital looking to reduce your maintenance backlog, be more proactive in maintaining your pumps, find energy savings or improve your compliance procedures, call us today to discuss

Choosing Dura Pump means investing in reliability and safety for your facility. Talk to an expert about your needs

We’ve had great reviews

Clear, Consistent Communication

The communication from Dura Pump to the customer is very good. We knew what was happening with the repair every step of the way

Purchasing Manager

Outstanding Turnaround

We just wanted to feedback our grateful thanks to Chris and Phil for all their hard work yesterday in getting us up and running again. To turn us around from failure to full recovery in 4/5 hrs was nothing short of exceptional. Please pass on our gratitude to them both.

Operations Manager

Seamless End-to-End Service

Service and communication received from initial inspection and specification through to delivery and installation of our replacement system was seamless. Thank you.

Facilities Supervisor

Informative & Helpful Engineers

Your engineers are always informative and always let me know when they are on site. Always very helpful, always kept well informed, which makes such a difference!

Building Manager

Fast, Friendly & Efficient

Fast, efficient, friendly staff in sales, accounts and installation. Very happy.

Project Coordinator

Top-Quality Workmanship

Over the moon with the service and quality of work/engineers.

Maintenance Manager