Injection Moulding Company Saves £250,000 Over 5 Years
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
An injection moulding company had experienced consistent failures over two years from its eight x 18.5 kW chiller pumps feeding chiller units.
A world-renowned flooring manufacturer approached us with an urgent need. Its insurance company had condemned its old fill and spill system.
Glazpart is a leading player designing and manufacturing Plastic Glazing Accessories for the Fenestration Industry.
With energy costs constantly rising, Warwick Hospital approached leading industry specialists Dura Pump on how to save energy.
A company that manufactures titanium fins for jet engines required our expertise with some of its pumps, due to failures.
When making beer, everything has to be ‘just so’. The hops; the recipe; even each pump part: it’s a finely balanced process. That's why Dura Pump...
A large, family-owned pet food manufacturer in Northamptonshire, that makes natural, wholesome pet food with British ingredients needed...
Cummins is a global leader in the design, manufacture and servicing of diesel and alternative-fuel engines, generators and related technology.
We were recently approached by a powder coating company whose production line had suffered a fault. Dura Pump happily accepted...
A pet food manufacturing plant approached Dura Pump for advice and guidance regarding the specification of a pump to pump gravy.
A large aroma manufacturing plant required assistance after receiving the results of an inspection from the Water Authority.
Dura Pump were excited to work on a new, modern state-of-the-art dessert production factory, who required assistance with upgrading their submersible pump station.
A busy food production company were fed up of being plagued with persistent submersible pump failures. The team at Dura Pump were...
Dura Pump were called to attend a block of flats in a converted shoe factory. They needed someone to step in and find a resolution. That's exactly...
A large manufacturing plant needed assistance with their heat exchanger pump and, being an industry-leading pump specialist, Dura Pump had...
Dura Pump were contacted by a floor manufacturing plant in Coventry who required a basic pump station for stormwater runoff from their yard.
When a large global heat treatment company needed our help to update their tired 20-year-old pump system, we were up to the challenge.
A Global Engineering Consultancy has had new pump system installed with a downtime of less than 2 hours!
A large distribution warehouse needed critical support during COVID-19 lockdown to ensure supplies kept flowing.
Creating simple cost-effective systems can reduce the need for labour-intensive work, safer handling of product and manual handling.
A large food manufacturing site was at risk of contaminating watercourses with their vehicle bay run-off.
A food manufacturing plant required a pump to transfer various food products but was at risk of running dry.
Snack food factory required a solution to fix wastewater blockage issue that was impacting the process.
A large cooling tower system at a pet food manufacturer was operating 24 hours a day/6 days a week and was wasting a lot of energy.
Our customers want solutions they can trust in timeframes that suit them. When a customer contacted us with a specific need, we provided the best solution...
The Dura Pump engineers were challenged with replacing an obsolete control system at a busy food manufacturing company.
A factory that produced plastic road barriers wanted a solution that would improve the sustainability and productivity of their production line.
Dura Pump were contacted for their expertise when the largest British-Owned crisp manufacturer suffered a pump outage at their production plant.
Dura Pump Supplied A Dewatering Pump To Save A Flood Occurring At A Logistics Centre.
How Dura Pump Successfully Installed Chiller Pumps to Boost a Plastic Moulding Companies Efficiency.
In response to an RO system issue, Dura Pump installed a Cat 5 break tank and pump system to restore water pressure.
Portability was a key requirement for our food industry client. Dura Pump specified and installed an efficient, portable pump station.
A new client called us faced with a problem nobody wants: a failing sewage system. We attended the site and found some very old Mono progressive cavity pumps, SB munchers and level controls that were no longer fit for purpose. The system was tripping out and required a major overhaul.
An abattoir was experiencing high levels of solid content in their DAF wastewater treatment plant, causing severe blockages in their drainage system.
We had one of our clients - a chicken processing plant - contact us with an issue regarding a failing chilled water pump.
Dura Pump were approached by a leading electronic chip manufacturing company who were in need of an upgraded wastewater system within their laboratory.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.
A Chicken Processing Plant required a pump station to improve its operation and reduce its servicing and energy costs.